Description

KTS KERN pre-assembled the Invert Formwork which consists of 4 main parts: the 12.5m long forms, the trelliswork, the carrier and the upper structure made with the TSK system. This last structure as a double function; contrasting the up-lift force due to the fresh concrete pressure and support the chain hoist to transport the material from one side of the machine to the other.

On the 02.02.2018 has been performed the first commissioning of the machine with the final client in the KTS KERN's workshop. The machine will be now partially disassembled and delivered to job site.

Project Details